The wind-riding, wave-cleaving "Heping No. 28"

乘风破浪的“和平28号”
Chengfeng polangde "Heping 28 hao"
The wind-riding, wave-cleaving "Heping No. 28"
1958, September
Shanghai renmin meishu chubanshe (上海人民美术出版社)
53.5x77.5 cm.
PC-1958-016

The coastal bulk carrier "Peace 28" (和平28 - Heping 28) was constructed at the  Shanghai Jiangnan Shipyard (上海江南造船厂) in 1958 in just 70 days. This was presented as a triumph of the working class just after the campaign against the 'rightists'.

31.356587, 121.503977

Share this page

Order a reprint of this poster at chinesepostershop.com: